The Barton Springs Road bridge over Barton Creek was built in 1926, widened in 1946 and carries about 20,000 vehicles a day at the entrance to Zilker Park. In August 2023, the City’s engineering consultant AECOM recommended posting the bridge at a 49,000-pound gross limit and 22,000 pounds per axle. AECOM said the arch ribs fail the load rating because they lack confinement reinforcing; the rating values are redacted. City slides report degradation in every structural component, worst in the deck, floor beams and spandrel columns. They compare rehabilitation, which would keep less than half of the historic structure and hide it behind new material, with one-, two- and three-span replacement bridges, then name a preferred option. Austin Water’s February 2025 60% design plans show the new bridge carrying a 12-inch water line in a steel casing, with a rebuilt 24-inch wastewater line beneath.
Barton Springs Road Bridge Condition and Replacement Design 2023–2026
File Type: pdf
File Size: 32 MB
Categories: Austin Parks and Recreation