Barton Springs Road Bridge Correspondence and Withheld Records 2026

In May 2026, SOS Alliance asked for correspondence among three City departments about the bridge (C315786) and for the City’s preservation option analysis (C324347). On August 3, August 10 and August 18, 2026, Assistant City Attorney Victoria Hayslett asked the Attorney General to withhold bridge structural and utility design records under the Texas Homeland Security Act (Gov’t Code §552.101 and §418.181). She argued that release would put the bridge at increased risk of terrorism. The City also sought to withhold a draft historic-resources document as a deliberative draft (§552.111), and named attorney-client privilege (§552.107) and third-party interests (§552.305).

AG ruling determined documents should be released. Redacted correspondence involving Eric Bailey (C315908) is included. Correspondence also included information regarding the Historic Landmark Commission review process and why the bridge may qualify. The public comments from the engagement process are also included encompassing neighbor’s opinions about the potential changes to the bridge.

File Type: pdf
File Size: 192 MB
Categories: Austin Parks and Recreation
Scroll to Top